IRRIGATION INSTALLATION
The irrigation
system installation has been on-going for over one month.
The two well pumps have been installed and the Town Wiring
Inspector has approved the electrical installation for the
pumps. The main
water line from B Circle to A and C Circles is in place. Work
has now moved to trenching in B Circle for new lamppost wiring.
A Circle wiring and post installation has been completed.
Lights in A, B and C Circle have been temporarily out of service
and will remain out until the new wiring has been installed.
The
electrical contractors will be making every attempt to provide
temporary service for lights until the new wiring
has been installed. Our goal this year is to install a fully
functioning irrigation system in A and B Circle as well
as new electrical systems for the lampposts in all 3 circles.
Irrigation in C Circle will be attempted provided the
weather holds. Lampposts and fixtures are being replaced on
an as needed basis.
|
2002 Annual
Meeting
The 2002
Annual Meeting was I held on October 24, 2002. For those who
were not in attendance, enclosed you will find handouts that
were provided on the evening of the meeting. During the meeting,
an election to 5 positions on the Board of Trustees was held.
Mike Carroll, Maura McKinley, Bob Mercaldi, Pat Pomerleau
and Richard Zelley were elected to two-year terms of service.
Congratulations!
There
is no change to the monthly condominium fee for fiscal 2003
(other than the special assessment which began this month,
November).
|