|
Past Issues |
|
Last November's Issue |
|
October/November 2003 |
|
|
|
|
|
IRRIGATION
FINALE & ELECTRICAL UPGRADE
The irrigation installation
project is wrapping up. A through E
Circles have been completed. Hydroseeding was used as a test in D and E
Circles. System testing will be
on-going. The entire system is fully
operational for Spring 2004 start up.
Please note: the sprinkler project included the removal
and replacement of lamp posts, fixtures and the underground wiring that ran
post to post. The extra trenching
throughout the community was due to the electrical code and inspector’s
requirements that lamp post wiring had to be set 18 inches deep. B CIRCLE
STONE
Residents of CHECK OUR
WEB SITE
ROUTE 3
SOUND BARRIER
The Route 3 project is progressing in our
neighborhood. The drainage project
from the median strip to Scotty Hollow stream is winding up. The sound barrier protecting E, D and parts
of PAINTING
UPDATE
J.P. Cricones Painting
has wrapped up painting in PAVING
REPAIRS
Roadway paving repairs are in process. This work is being provided by a
sub-contractor hired by Valley Green Landscaping, the company installing the
irrigation system. HAVE YOU
NOTICED? Over the past 12 months, we have seen a tremendous
amount of work completed at Scotty Hollow.
Major stone wall replacements, swimming pool facility and furniture
upgrades, irrigation system installation, installation of exterior lamps,
posts and wiring and carpentry repairs and painting of 52 units in A and B
Circle are a few of the projects that have been completed or are near
completion. |
CLUBHOUSE
Attached you will find an announcement of an
upcoming holiday party for REFINANCING
OR SELLING?
If you are in the process of refinancing or
selling your home, you must obtain a 6(d) Certificate in order to close on
the refinance or sale. You must
contact Coleen at Property Management of Andover at 978-683-4101 to obtain
this certificate. Your request for the
6(d) Certificate must be made at
least ten days prior to the closing date in accordance with the
General Laws of the Lastly, there is a $50.00 charge for the
preparation of this certificate and the completion of all other
closing paperwork and tasks (i.e. bank affidavits/questionnaires, telephone
calls and faxes with information relative to the condominium – budgets,
minutes, etc.). CONDOMINIUM FEES
Condominium fees should be made payable to INSURANCE INFORMATION
The insurance agent for Please keep in
mind that you must maintain your own insurance policy (referred to as an H06
policy) on your condominium to protect your personal property, liability and
the deductible portion of Your policy should also provide for any
re-location expenses required if your unit becomes uninhabitable (i.e. due to
fire, broken pipe, etc.). Please keep
this information for future reference.
|